真人葡京网

Home
Group Overview
news
Business area
Party work
Social responsibility
Human Resources
Group Media

Jiangxi Gan'e Wan Road and Bridge Investment Co., Ltd.

Jiangxi Jiang'e-Wan Road and Bridge Investment Co., Ltd. is a joint venture company approved by the people's governments of Jiangxi, Hubei, and Anhui Provinces and established by the investors of the three provinces with reference to the original investment proportion when the Jiujiang Yangtze River Bridge (Highway Bridge) was built in 1987. The company was founded in 2012 with a registered capital of 60 million. In August 2013, the company's entire system received the management functions, assets, and personnel of the former Jiujiang Yangtze River Bridge (Highway Bridge) Administration Bureau, and carried out operational management of the Jiujiang Yangtze River Bridge highway bridge (hereinafter referred to as "Jiujiang No. 1 Bridge").

The Jiujiang First Bridge is located at the junction of Jiangxi, Hubei, and Anhui provinces. It crosses the Yangtze River and connects Jiujiang City, Jiangxi, and Huangmei County, Hubei. It is a super-large highway-rail dual-use bridge on the Beijing-Kowloon Railway main line. The bridge was completed and opened to traffic in January 1993. The total length of the railway bridge is 7,675 meters, which is a Class I dual-track railway. The total length of the highway bridge is 4,460 meters, which is a Class I highway. It is currently the largest flexible arch rigid beam continuous welded steel truss in China. Girder bridge. The bridge is novel, light, beautiful, and majestic. There are 11 scientific and technological achievements in design and construction that have set a new bridge record at home and abroad. It has won the first prize of the National Excellent Design Award, the first prize of National Science and Technology Progress Award, the National Quality Engineering Award, and China Construction Engineering. The Luban Award erected the third milestone for bridge construction in China.

The Ganhe-Ewan Road and Bridge Company started the preliminary work of the Jiujiang No. 1 Bridge reinforcement and reconstruction project in 2012. In 2014, the Development and Reform Commissions of Jiangxi and Hubei Provinces formally approved the project and approved the preliminary design of the project, which was also listed as a key transportation project in Jiangxi Province. The main content of the project is to strengthen and transform the existing main bridge and approach bridge, highway facilities and pipelines, bridgehead towers, toll stations, monitoring centers, and company management buildings. The total estimated investment for the project is 1.1 billion yuan. On June 23, 2015, the bridge reinforcement project was officially started, with a construction period of 42 months. After the transformation, the designed driving speed is 60km / h, and the car load level is highway-Ⅰ. At the end of 2018, the bridge reinforcement and reconstruction project will be completed and opened to traffic, and the company will fully enter the period of operation and management. By then, the Jiujiang First Bridge will be presented to the world with a new look.


Company news
  • Jiangxi Gan'e Wan Road and Bridge Investment Co., Ltd.

    Jiangxi Jiang'e-Wan Road and Bridge Investment Co., Ltd. is a joint venture company approved by the people's governments of Jiangxi, Hubei, and Anhui Provinces and established by the investors of the three provinces with reference to the original investment proportion when the Jiujiang Yangtze River Bridge (Highway Bridge) was built in 1987. The company becomes ... >>>

    October 19, 2019
  • The Jiujiang Yangtze River Bridge is successfully opened for operation

    At 00:00 on January 6, 2019, after more than three years of reinforcement and reconstruction, the Jiujiang Yangtze River Bridge was opened to traffic.

    At 9 o'clock at night, vehicles came to the lane entrance one after another. Car ... >>>

    January 07, 2019
  • Jie Xiaojian and his party went to Jiujiang First Bridge to guide the opening operation

    On December 26, 2018, Jie Xiaojian, Party Secretary and Chairman of the Group Corporation, Liu Gang, Deputy Secretary of the Party Committee, Rao Lixin, Member of the Party Committee and Chief Financial Officer, and Li Shaobo, Chief Economist, and his party went to Gan Ewan to guide the opening of Jiujiang First Bridge.

    Jie Xiaojian and his party ... >>>

    January 03, 2019
  • Jie Xiaojian, Secretary of the Party Committee of the Corporation, visited Jiujiang First Bridge and Jiujiang Second Bridge

    On March 21, the secretary of the Party Committee of the Group Company revealed that Xiaojian's light trucks were inspected and guided from Jiujiang No. 1 Bridge and No. 2 Bridge to inspect the construction of Jiujiang No. 1 Bridge reinforcement project and the operation of the toll collection of Jiujiang No. 2 Bridge, as well as the construction and development of the two companies ... >>>

    March 23, 2018
1